Description
No Terminal 2 introduction is required as this is a group work and only the 3 points have to be critically evaluated:
– what alternative solutions could have been used on the project? – compare the Terminal 2 process with alternative solutions
This could have been materials, technology or different structures.
– design and building regulations – what building regulation did the project had to meet?
– what was the objective and has the design satisfied clients criteria
Evaluation of the structural forms, construction materials, and construction
technology.