List all the likely risks that this project faces. Make the list as comprehensive as possible. Assess the probability of each risk occurring and assign it a rating. Use a scale of 1 to 10.
Read the Case Study, ‘Alaska Fly Fishing Expedition’ that has been attached List all the likely risks that this project faces. Make the list as comprehensive as possible. Assess the probability of each risk occurring and assign it a rating. Use a scale of 1 to 10. A score of 1 is very unlikely to […]